第1个回答 2007-06-08
Summary of the design of the Local Taxation Bureau of Changsha integrated floor central air conditioning systems, integrated floor of the main room for the type of restaurant, Ya restaurant, guest rooms, offices, meeting rooms, multi-purpose room and gym, etc., and the height 3.6 m, the rational design of central air-conditioning system is to indoor staff provide a comfortable working environment. Design elements include : calculation of the room cold, heat, moisture load; A comprehensive description of the air-conditioning system, broken down and analyze the characteristics of each system and application, according to the type and use of rooms of different functions. final air-conditioning system for the program : a restaurant, gymnasium and multi-purpose room was used once in the air ventilation system, a restaurant Blair, rooms, offices and conference rooms plus a new fan-coil wind system, a new wind will not bear indoor load; a simple analysis of air conditioning water system advantages and disadvantages of different forms of the design using two controls, closed, the same way the vertical pipe, --level pipeline, scheduled flow, single pump water system; Taking into account the weather in Changsha geographical environment, cold and heat source using air-cooled heat pump unit; Standard rooms as guest rooms, restaurants, etc. Ya between the adoption of side air. The remaining rooms are used for casual air flow; air conditioning system of hydraulic calculation; Auxiliary Equipment Selection and equipment damping and thermal processing. Keywords : Comprehensive floor, central air conditioning, a full return to the air ventilation system, fan coil unit plus new ventilation system